TDG provided Architecture, Civil, and Structural Engineering design services for the +/- 50,100 SF addition to the existing United Beverages distribution center in Hickory, NC. The project required demolition of an existing building and replacement with a new tilt-up wall structure. Some challenges were encountered with the existing footings and lower roof profiles, that resulted in a low roof connector piece.
SERVICES: Architecture, Civil Engineering, Structural Engineering
SIZE: 50,100 SF
SCOPE: Demolition and New Construction
DETAILS:
Tilt-up concrete wall panels
Exterior schematic renderings
Design services for TriVantage, an international supplier of all-weather fabrics. TDG provided Architectural, Civil Engineering, and Structural Engineering design services for their distribution facility in Mebane, North Carolina.
SERVICES: Architecture, Civil Engineering, Structural Engineering
SIZE: 102,150 SF
SCOPE: New construction
DETAILS:
LEED Silver Certification for new construction
Fabric and hardware for awning distribution
TDG provided Structural Engineering services for the Burris Logistics Cold Storage Facility. The warehouse was design-built with an expandable footprint to allow future growth. The office portion is a two-story tilt-up building.
SERVICES: Structural Engineering
SIZE: 252,775 SF
SCOPE: New Construction
DETAILS:
Two-story office
41’ warehouse clear height
Four storage rooms
Rooftop packaged refrigeration
IMP exterior walls at storage
Thermomass tilt-up at cold dock
Tilt-up at office & MHE
Expandable building design
Design-build project delivery
New $98.5 M facility standard freezer/cooler distribution center. The project brought 400 jobs to the region and was made possible through the Michigan Strategic Fund (MSF). The facility allows a major regional grocery chain to provide fresh, frozen and other foods to the local community.
SERVICES: Architecture, Structural Engineering
SIZE: 606,000 SF
SCOPE: New construction
DETAILS:
Dry goods, refrigerated & frozen storage
Multiple freezer rooms
14 banana ripening rooms
Insulated precast and IMP walls
Cross dock facility w/105 positions
Central ammonia refrigeration
Design-build project delivery