top of page

Distribution & Warehouse

​

Project Gallery

TDG provided Architecture, Civil, and Structural Engineering design services for the +/- 50,100 SF addition to the existing United Beverages distribution center in Hickory, NC. The project required demolition of an existing building and replacement with a new tilt-up wall structure.  Some challenges were encountered with the existing footings and lower roof profiles, that resulted in a low roof connector piece.

​

SERVICES: Architecture, Civil Engineering, Structural Engineering

SIZE: 50,100 SF

SCOPE: Demolition and New Construction

DETAILS:

  • Tilt-up concrete wall panels

  • Exterior schematic renderings

Design services for TriVantage, an international supplier of all-weather fabrics.  TDG provided Architectural, Civil Engineering, and Structural Engineering design services for their distribution facility in Mebane, North Carolina.

​

SERVICES: Architecture, Civil Engineering, Structural Engineering

SIZE: 102,150 SF

SCOPE: New construction

DETAILS:

  • LEED Silver Certification for new construction

  • Fabric and hardware for awning distribution

TDG provided Structural Engineering services for the Burris Logistics Cold Storage Facility.  The warehouse was design-built with an expandable footprint to allow future growth.  The office portion is a two-story tilt-up building.

​

SERVICES: Structural Engineering

SIZE: 252,775 SF

SCOPE: New Construction

DETAILS:

  • Two-story office

  • 41’ warehouse clear height

  • Four storage rooms

  • Rooftop packaged refrigeration

  • IMP exterior walls at storage

  • Thermomass tilt-up at cold dock

  • Tilt-up at office & MHE

  • Expandable building design

  • Design-build project delivery

New $98.5 M facility standard freezer/cooler distribution center.  The project brought 400 jobs to the region and was made possible through the Michigan Strategic Fund (MSF).  The facility allows a major regional grocery chain to provide fresh, frozen and other foods to the local community.

​

SERVICES: Architecture, Structural Engineering

SIZE: 606,000 SF

SCOPE: New construction

DETAILS:

  • Dry goods, refrigerated & frozen storage

  • Multiple freezer rooms

  • 14 banana ripening rooms

  • Insulated precast and IMP walls

  • Cross dock facility w/105 positions

  • Central ammonia refrigeration

  • Design-build project delivery

  • LinkedIn

©2026 by Triad Design Group

bottom of page